ERPNext's subcontracting workflow has changed substantially with each version release of the software, generally without backwards compatibility. This feature offers an alternative to using a Purchase Receipt or the Version-14 Subcontracting Order and Subcontracting Receipt documents. Instead, it allows you to manage the subcontracting process with Work Orders, Purchase Orders and Invoices, and Stock Entries.

Configuration

To enable this feature, check the "Enable Work Order Subcontracting" box in Inventory Tools Settings.

The feature also has the following prerequisite configuration to get it up and running:

  • Items:
    • For any subcontracted Item, check the Supply Raw Materials for Purchase box. This is found in the Manufacturing section of the Item master
    • Optional: create a service Item (uncheck the Maintain Stock box in the Item master) to represent the services provided by the subcontractor. The ERPNext workflow requires service Items in subcontracted Purchase documents, however this is completely optional in this feature. Instead, when a subcontracted Purchase Order is created from a Work Order, the finished good received from the subcontractor will populate the Items section of the form
  • Warehouses:
    • create a dedicated warehouse for each subcontractor to track materials sent to them
  • Bill of Materials (BOM):
    • Create a BOM for the subcontracted Item that includes raw materials supplied to the subcontractor and check the Is Subcontracted box. This BOM should not include any operations, as they are done by the subcontractor
    • The feature supports processes done at times in-house and at times by a subcontractor. There should be separate BOMs for each process, with the appropriate one linked to in the Work Order

Work Orders

This feature starts with a Work Order for a subcontracted Item. As noted in the Configuration section, there should be a BOM in the system for the Item, which lists all the raw materials supplied to the subcontractor, no operations, and has the Is Subcontracted box checked.

Screen shot of a second BOM for Pie Crust, an Item made in-house as well as subcontracted, with the Is Subcontracted box checked

The Work Order should tie to the subcontracted BOM. Once you submit the Work Order, you'll see a Subcontracting button with the options to create a new subcontracting Purchase Order (PO) or add the Item to an existing one.

Screen shot of a submitted Work Order for the subcontracted version of Pie Crusts. The subcontracted BOM

Create a New Purchase Order

If you click Create Subcontract PO, you'll see a dialog to enter the supplier, then the system generates a draft Purchase Order.

Screen shot of the Purchase Orders listview containing a new draft PO

By default, the new subcontracting Purchase Order adds the same Item as what is being manufactured in the Work Order. This can be changed as needed. There's also a new Subcontracting Detail section with a table that tracks any Work Order(s) linked to the PO. The table includes the Work Order name, Warehouse, finished good Item name, BOM name, quantity, and UOM information.

Screen shot of the Items and Subcontracting tables in the subcontracted Purchase Order. The Items table includes 10 Pie Crusts and the Subcontracting table includes the Work Order details

Add to an Existing Purchase Order

If you click Add to Existing PO, you'll see a dialog to select the applicable Purchase Order. The options are limited to non-cancelled, subcontracted POs only. Note that if the selected PO is already submitted, this action will cancel and amend that PO to include the additional Items from the Work Order and keep it in draft status until you review and submit it.

Stock Entries

This workflow expects you to utilize Stock Entries to record raw material transfers to the subcontractor and to receive subcontracted finished goods into inventory. This part of the process retains default ERPNext behavior. You can create a Stock Entry of type Material Transfer for Manufacture against the Work Order to track raw materials going to the subcontractor. The Target Warehouse for Items should be a dedicated warehouse in the system for the subcontractor.

Screen shot of a Stock Entry of type Material Transfer for Manufacture showing the raw materials required for 10 pie crusts being moved to the subcontractor's Credible Contract Baking warehouse

When the subcontractor delivers finished Items, a Stock Entry of type Manufacture records the consumption of raw materials from the subcontractor's warehouse and the receipt of Items into the appropriate company warehouse.

Screen shot showing a new Stock Entry of type Manufacture against the Work Order for the subcontracted goods

Screen shot of the Items table in a new Stock Entry of type Manufacture that shows the consumption of the raw materials from the Credible Contract Baking warehouse and receipt of Pie Crusts in return

Purchase Invoice and Stock Entry Reconciliation

At invoice time, this feature includes a reconciliation tool in the Purchase Invoice (PI) to compare Items ordered from the subcontractor with what has been received and what has been paid for. Click the Fetch Stock Entries button under the Subcontracting table to collect all Stock Entries of type Manufacture for subcontracted goods. A dialog window allows you to (optionally) narrow the selections within a date range.

Screen shot of the new Subcontracting Detail section in a subcontracted Purchase Invoice with a Fetch Stock Entries button

The results of all valid stock entries populate the Subcontracting table, and show the Work Order name, Purchase Order name, Item name, total quantity, the quantity that's been paid for already (Paid Qty), and the outstanding quantity remaining (To Pay Qty).

In the example, the Purchase Invoice covers two Purchase Orders (each generated off of a Work Order) for 50 and 10 Pie Crusts, respectively. A separate PI already covered 20 Pie Crusts, as shown in the Paid Qty column, so there are only 40 remaining un-invoiced Pie Crusts. The Accepted Qty field in the Items table can be adjusted to capture only what remains to be invoiced.

Screen shot of the Subcontracting Detail table with two Stock Entries. One is for 50 Pie Crusts, of which 20 have been paid for and 30 remain outstanding, the other is for 10 Pie Crusts of which all are outstanding. The Accepted Qty field in the Items table for the 50 Pie Crusts is boxed to highlight that it needs to be adjusted for what's already been invoiced